Use these instructions to install a Flex System Manager management
node in the Flex System Enterprise
Chassis.
You can install a management node while the chassis is powered on.
- Make sure that enough power supplies and fan modules are installed
in the chassis to support the management node. See Installing components to determine
the number of power supplies and 80 mm fan modules that are required
and where they should be installed in your chassis configuration.
- Read the documentation that comes with the management node. Flex System Manager documentation
is available from the Flex System Manager information page.
To install a Flex System Manager management
node, complete the following steps.
- Remove the bay filler, if one is installed. Push the filler
release tab to the right; then, grasp the filler by the slot and pull
it out of the bay.
- Open the release handle (rotate the handle to the left).
- Slide the management node into the chassis bay until it
is seated.
- Close the release handle (rotate the handle to the right).
After you install the
Flex System Manager management
node, complete the following steps:
- Connect all cables to the management node.
- Restart the management node.
See the Flex System Manager Installation
and Service Guide for instructions.
- Configure the management node by restoring a previously saved
image. See the Flex System Manager Installation
and Service Guide for instructions.